Andi, Joshy & Holli
16.04.08
Andi, Joshy & Holli
07.04.08
Thomas
04.04.08
Nicklas, Martin & Reto
03.04.08
Andi, Joshy & Holli
29.03.08
Thomas
19.03.08
Andi, Joshy & Holli
19.03.08
Andi, Joshy & Holli
18.03.08
Andi, Joshy & Holli
13.03.08
Thomas
10.03.08

ENGADIN / ST. MORITZ

Mellow Park 800 m Long , 2.475 m Above sea level

The name says it - Mellow style in the park and thanks to his altitude there was even enough snow in the past season.

xlarge

local news local news local news

Local Shapers News

No Entries

no news in this list.

Park News

  • There is no Local Shaper News

technical facts

  • Country:
  • Superpipe: 0
  • Halfpipe: 100m
  • Pro Line: 2
  • Public Line: 2
  • Easy Line: 2
  • Banked Course: 350m
  • Rails: 8
  • Boxes: 6
  • Kicker / Hip: 14
  • Total Takeoffs: 30
  • Park entrance: 2.475 m
  • Park length: 800 m
  • Park lift: 2x 900m
  • Earth shapes: no
  • Snow cannon: 3

resort info

Interview withTommy ´Mellow´Marsh from Mellowpark ST. MORITZ

 

Short designer history and which features do you still ride: Head of Design since 4 years. I ride all the park obstacles of course
Short snow park history: The park exists since 4 years. Before there was no park just a pipe, so Mellow Parks were the first who founded a snowpark in St. Moritz
Shaper Crew: 3 people, approx. 60hours per week
Cat shaping hours: 3hours per day
Position of the park: The park is situated along the 4 seat-chairlift. The upper part is pretty flat while the lower part gets a bit steeper
Park philosophy: Mellowstyle – everybody should be able to ride the park, all obstacles should be in good shape
Percentage of park areas: Pro 15%, Public 45%, Beginner 40%
The importance of a Pro area:  They are not the main target group of our park
Local Pro rider: Michi Albin
Visiting Pro riders and teams: It always depends on the powder...
General news for 07/08: Enlargement of the park along the entire length of the lift
Events 07/08
: January 12th – 13th, 2008 Snowparktour 08 Kick Off March 2008, tbc Southside Jam finals
Shape and style of the obstacles: Mellowstyle
New rails and boxes: 1 tree chunk
Shape and style of the rails and boxes:
New snow obstacles, lines or projects: A new line down to the valley-station
Shape style of the new obstacles:
Planned park modification or changes later in the season:
Top nationalities: CH, ITA, GER
Safety precautions and inventions: Mellow Constructions are famous for their safe parks and signing of the obstacles – pioneers of snowpark safety
How about a (super)pipe:  The pipe is located on its old place, so we don´t need a new machine at the moment
Any epic or funny events in the past: 2 times Chicken Jam in 2005 and 2006
Your freestyle park vision: Many people riding the park
Freeride possibilities in the backcountry: Enough – the Engadin is the Hawaii of Snowboarding